Project Description
Guide Dogs for the Blind
General Contractor: Lathrop Construction Assoc. Inc.
Project completed 2020
Materials Used:
- Storefront with thermally broken Kawneer Doors and Frames VG451T
- 1″ Insulated glass from Thermalsun Glass Products, Inc.
- C.R. Laurence Dry-lock rail system with 9/16″ clear & satin etch tempered laminated glass